Before And After Gallery

Page 1 / Page 2

Gallery 1


Project - Convert Spare Room to 2nd Bathroom.
Work Involved: 2 dormer window walls being reduced, including recess and concealed lighting. Bath encased with Marble Mosaics and Emperador Marble.
Project time: Monday to Friday

Gallery 2


Project - Combine Bathroom and separate WC and replace bath with walk-in shower.
Work Involved: Removing internal solid wall, and repositioning and replacing bathroom door. Extending existing hot press, including new door and spar shelving. Re-plaster top half of bathroom and ceiling and install chrome extractor fan and down lights. Tilling walls half height, shower enclosure and floor.
Materials used: Kudos 1700 Walk-in shower enclosure, Aqualisa Quartz digital power shower, 1200x500 Chrometowel warmer, Roca Giralda WC and Washhand basin.
Project time: Monday to Friday
Website Photo Gallery Software by VisualLightBox.com v2.3

Gallery 3

Project - Redesign En-suite and install shower enclosure, wall hung vanity unit, wall hung WC.
Work Involved: Stripping out existing suite and all tiles, Reposition WC and vanity unit, Building casing for toilet frame including recesses with concealed lighting. Tile walls and floor including skirting tiles.
Materials Used: Wall hung WC with concealed steel frame. Bespoke wall hung walnut vanity unit and cabinet with mirror. 910 Kudos shower enclosure with Aqualisa Axis thermostatic valve.
Project Time: Monday to Thursday